INTEGRATED MANAGEMENT SYSTEM
RM Watson Pty Ltd manages all aspects of our work through our integrated management systems. This covers safety, environment and quality and ensures all our work is not only performed safely but also to the highest quality and with a minimal impact on our environment.
WHS MANAGEMENT
RM Watson Pty Ltd has accreditation of our WHS system under the WHS Management Systems and Auditing Guidelines (Edition 5) with the Compliance Council.
In terms of WHS risk management, an assessment will be undertaken to evaluate the potential health and safety risks to the client, the public and all persons working on the site. The measures necessary to control these risks will be determined and managed by RM Watson using Risk Score Matrix and Hierarchy of Controls.
QUALITY ASSURANCE MANAGEMENT
Projects have a site-specific quality plan prepared prior to commencing on site. This plan is written after all aspects of the scope of works, project risks, works methodology and environmental impact are assessed during our project pre-commencement planning process. Project check lists are used to assess and maintain quality during the production process. The site foreman, project manager and quality manager work together to prepare and maintain the site records.
ENVIRONMENTAL MANAGEMENT
As most of our site activity has an impact on the environment, the management of this aspect of a project is planned during pre-commencement discussions. Our goal is to minimise if not eliminate this impact so all aspects of waste and run-off control as well as recycling are considered in our planning. The site foreman is responsible for all aspects of the site environment.
R M Watson Pty Ltd management and staff are committed to the completion of their work and services for their clients to the highest standards of environmental care required to deliver a satisfactory outcome of the contractual requirements.